Selling
a house for relocation.
You may be
in the position where you already own a house, and for
personal or investment reasons wish to sell it for removal.
KHR purchases
good weatherboard and brick-veneer houses for removal.
The things
KHR looks for in relocatable houses are:-
- the house
must be sitting on stumps, not on a concrete slab
- the house
site must be reasonable level
- KHR avoids
house sites that have high retaining walls next to the
footpath
- good access
is important – mature trees and electricity poles
may cause problems
- wide road
access is an advantage
- single-storeyed
houses are preferred
- houses
with 3-4 bedrooms are preferred
- houses
that have undergone renovations especially in kitchens
and /or bathrooms are preferred
- houses
with character are preferred, no matter what age
- time-frame.
It takes four weeks to obtain a Permit to Remove (similar
to a Demolition Permit) from the local council Building
Department. KHR prefers 6-10 weeks’ notice
when purchasing a house for removal.
Initially
KHR will look at the outside of the house you wish to
sell and decide on its suitability for removing.
If the site is suitable, arrangements are made to inspect
the interior of the house and a price is agreed upon (depending
on the fixtures and fittings inside and whether or not
the owner wants the house remover to arrange total site
clearing). Also an approximate date is established
for the removal. It takes about 5 working days to
remove a 12sq. weatherboard house.
KHR is responsible for paying for and applying to the
local council for the required permits, and is responsible
for any damage caused to the front footpath, nature strip
and neighbouring side fences. In KHR applying for a Demolition
Permit the owner must sign a letter for the council giving
KHR permission to remove the particular house.
In light of
the above-mentioned criteria, KHR pays between $1,000
and $15,000 for a house (weatherboard or brick-veneer)
for Removal.
KHR will pay
a 10% deposit on the owner signing the “House Purchasing
Contract” and the
balance on the day of job commencement.
|